12th Feb 2018 – GGH Site

  • Pic1 – Ground floor plan to compare with actual build
  • Pic2 – Photo of outer wall of the building and rods of pillars inside the building
  • Pic3 – Photo on internal area of the building. Each floor is approximately 18,000 square feet.

12th Feb 2018 – GGH Site

  • Pic1 ground floor site plan to compare with pic2 and pic3 of actual builds
  • Pic2 drum section of the build which will be the reception area
  • Pic3 Another view of drum section

Hospital construction: Pilling works at GGH May 2018

Progress as of April/May 2018: Construction of Gobindagonj Hospital (GGH)

The pilling work started earlier in May and is expected to take three months to complete.

Followed by the construction of the pillars and the ground floor of the building. Below are some images and videos.

Tube well

Material store being built for the construction of GGH.

Pilling Machine being unloaded

Pilling Rig

Pilling Rig